THE PROJECT

To improve commuter and freight rail efficiency, the NSW Government commissioned an upgrade to the Sydney Main Northern Line by introducing a third track between Epping and Thornleigh train stations.  A 12 m high sandstone cutting required widening to allow northbound freight trains to operate independently from commuter trains while maintaining uninterrupted commuter rail operations.

PSM were engaged to analyse and design rockfall protection measures to ensure rail safety during excavation of the slope, which was approx. 1 metre from the rail kinematic envelope.

ENGINEERING AND TECHNICAL OPPORTUNITIES

Eliminate rockfall risk impacting the live corridor due to the adjacent active rail line.

Rockfall protection installation within the tight rail shutdown period.

Engineering solutions were required due to the tight spatial constraints (active line <1 m from slope toe).

APPROACH AND INNOVATION

Completed detailed site investigation including photogrammetry and cliff geometry modelling to assess defect spacing, maximum boulder size and release mechanisms.

Rock mass characterisation and assessment of material properties critical for estimating block runout distances and bounce heights.

Performed numerical modelling of rockfall paths, interactions with the slope geometry and mitigation measures. Analyses guided the design of protection fences and slope modifications required to ensure no credible boulder could impact the live corridor.

Verification during construction showed accurate prediction of rockfall sources, runout paths and protection requirements.

OUTCOMES

PSM delivered innovative and pragmatic engineering solutions in a timely and effective manner that eliminated rockfall impact and allowed the commuter rail to remain operational during the works. Targeted site investigations, modelling and rigorous design methodology instilled stakeholder confidence in the successful delivery of a high-profile, high consequence public infrastructure project.

Services: #CivilGeotechnical #EngineeringSolutions #Geotechnical #Railway #Infrastructure

get in touch

Contact Us

For expert advice, reach out to our team today.

    Technically Assured Organisation
    Locations

    Sydney

    G3, 56 Delhi Road
    North Ryde NSW 2113

    BRISBANE

    Level 6, 500 Queen st
    Brisbane QLD 4000

    PERTH

    Level 3, 22 Delhi st
    West Perth WA 6005

    GEELONG

    O16, L4, 60 Moorabool St
    Geelong VIC 3220
    Contact us
    Locations

    Sydney

    G3, 56 Delhi Road
    North Ryde NSW 2113

    BRISBANE

    Level 1, 500 Queen St
    Brisbane QLD 4000

    PERTH

    Level 3, 22 Delhi St
    West Perth WA 6005

    Geelong

    Suite 2, L4, 92-100 Brougham St
    Geelong VIC 3220
    Contact us
    Footer Certification
    Footer AEC logo